TEDOM trigeneration with a UPS provides a highly reliable on-site energy solution for data centers, significantly reducing dependence on the public grid.
By combining electricity generation with efficient cooling from waste heat, it lowers operating costs and increases flexibility compared to conventional grid supply and compressor-based cooling.
The UPS stabilizes voltage quality and ensures seamless ride-through during short-term outages or unit transitions.
This results in a resilient, scalable energy infrastructure with a lower total cost of ownership and improved operational security.
On-site electricity generation → higher supply reliability
Capability for islanded operation during grid outages
High availability and reliability
Utilization of waste heat → free or low-cost cooling production
Stable cooling supply even during peak loads
High overall efficiency (80–90%)
Ability to respond to electricity prices (peak shaving, demand response)
Significantly reduced IT cooling costs
Modular design (250 kW → 4.5+ MW) allows easy capacity expansion as the data center grows
Multiple operational modes as needed
Robustness and security of the aggregated unit
Energy under control
When uptime matters, generation must be on-site
Stability, cooling, savings. All in one
Future-proof energy for next-generation data centres