We were approached by the client in late 2018 to help them lower their energy costs and carbon footprint. We undertook a detailed review of all 13 of the customer’s sites and decided that 5 would benefit from the installation of a combined heat and power system (CHP). With planning consent required at all but one club and the disruption caused by COVID-19 delaying installation, the team worked efficiently to ensure that the last project was commissioned in early 2021.
With the exception of Benton Hall where the unit was installed within an existing plant room, the other four clubs required bespoke weatherproof acoustic enclosures to be built and installed. Each was sympathetically designed to minimise their impact and installed adjacent to existing boiler rooms.
Gross CO2 saved from Mar ’20 to Mar ’22
Energy saving from Mar ’20 to Mar ’22
Electricity generated from Mar ’20 to Mar ’22
Heat generation from Mar ’20 to Mar ’22
Reduce operating costs
Electricity – lighting and power for public areas, bedrooms, and club facilities
Heat – hot water production for swimming pools, leisure facilities and space heating
Air conditioning systems – used to keep rooms and whole complex cool
Wide range of facilities operating 24/7
Constant energy usage due to the range of facilities offered and the 24 hour nature of the portfolio
Need for installed equipment to be quiet in operation to avoid disturbing guests
Integration with the wide range of electrical and heating systems found across the club portfolio
Implemented: On-Site Utility Solution
Combined heat and power (CHP)