Abbeycroft Leisure decided to implement our On-Site Utility Solution at its Haverhill Leisure Centre. Their plan was that substantial portion of their electricity, heat and cooling will be generated at their own site; rather than buying energy from the national grid. The savings have been delivered by a combination of a 100 kilowatt combined heat and power system (CHP) and an 85 kilowatt gas engine VRF heat pump – both of which have been provided on the basis that the equipment is owned, operated and maintained by TEDOM meaning zero capital outlay for Abbeycroft Leisure. We have now installed two more CHPs at two other Abbeycroft Leisure Centres in Bury St Edmunds and Newmarket.
Gross CO2 saved from July ’12 to Mar ’22
Energy saving from July ’12 to Mar ’22
Electricity generated from August ’16 to Mar ’22
Heat generation from August ’16 to Mar ’22
Reduce operating costs
Electricity – lighting and power for public areas, bedrooms, and hotel facilities
Heat – hot water production for space heating and leisure facilities
Air conditioning systems – used to keep rooms and whole complex cool
Size and complexity of the site
Our technical solution needed to be able to accommodate future energy demand
The new system had to fit in to the available space in the plant room
Air-conditioning to refurbished areas was needed; but without increasing electrical load (due to capacity issues on main incomer)
Implemented: “TEDOM On-Site Utility Solution”
100 kilowatt combined heat and power system (CHP)
85 kilowatt gas engine VRF heat pump (air conditioning)
Simon Ginders-Coxshall
General Manager – Abbeycroft Leisure