Thousand hours of operation

The TEDOM Polo 100 gas heat pump, installed at the TEDOM production plant in Tøebíè, reached a thousand operating hours in mid-February 2013.

The unit is located in a test centre adjacent to the assembly hall and is connected to the system of heating and cooling of the entire production plant. The objective is to verify the technical parameters of the unit on a long-term basis and to ensure the highest possible efficiency of the whole system.

Close

Send an Inquiry