New installation in Serbian town of Boka

In the past days, the TEDOM Quanto D400 SP CHP unit was installed in the town of Boka, Serbia, in a containerized version with a 329 kW output.

A gas treatment system was supplied by TEDOM in addition to the unit because the fuel is a gas from oil wells. The produced electricity is supplied to the grid, the heat is used to heat the extracted oil due to the separation of water. It is already the second running unit of a total of 4 delivered to the same customer.


Send an Inquiry