On the 7th of August 2017, we dispatched the second container of a total of four containing technology for the energy utilization of landfill gas near Ho Chi Minh City.

The container was wrapped in a special foil which protects it from the influence of humid air during its way to Vietnam. The whole project counts on 1,600 kW of electrical output that will be ensured by 8 pieces of TEDOM Cento T200 set in the container version where there will be two 200 kW modules placed in each containerovedení. The dispatch of the third and fourth container is planned for the November of this year.
Related articles
REFERENCES / CASE STUDIES
NATURAL GAS CHP UNIT IN A BIOGAS PLANT
As a flexible source of electrical and thermal energy, CHP units have a wide range of applications. In addition to the various fields of deployment, they can also burn various
...read more
REFERENCES / CASE STUDIES
More efficient power supply to the hospital in the city of Woodstock, Canada
Hospitals are certainly a suitable place for installation of cogeneration technology. These facilities have a high consumption of electricity and at the same time, due to their
...read more
REFERENCES / CASE STUDIES
Over 50 units for ENGIE Solution in France
We value the long term and successful partnership we have with Engie Solution on the French market. Recently, we commissioned the 50th CHP unit for this client since the beginning
...read more
REFERENCES / CASE STUDIES
Utilization of bio-waste with a positive impact on the environment and the local community in Liege, Belgium
The Ochain Energie biogas plant project could serve as a model example of how cogeneration can be optimally used in agriculture. The project had to overcome a large number of
...read more
REFERENCES / CASE STUDIES
Another Cento for ENGIE Solutions
One of the first units we put into operation at the beginning of this year was the TEDOM Cento 235 in Begles, France. We delivered this unit for our important partner and
...read more
REFERENCES / CASE STUDIES
Industrial plant has chosen TEDOM Poland
At the end of 2020, TEDOM Poland has completed a project consisting of delivery, assembly and commissioning of a cogeneration system producing process heat, steam and electricity,
...read more
Related references
Place of Installation
Country
CHP Unit Type
Fuel
Year
Biogas plant, Zawroty
Poland
Quanto 600
biogas
2022
Swimming pool, Fréjus
France
Micro 30
natural gas
2022
Biogas plant, Krąplewice
Poland
Flexi 350
biogas
2022
SUBSCRIBE TO THE QUARTERLY NEWSLETTER